The main pieces of the first wind-tunnel model have been manufactured by Metaltech S.r.l.!
![Landing-edge-part1](https://www.monnalisa-project.eu/wp-content/uploads/2021/10/Landing-edge-part1.jpeg)
Leading edge, part one.
Material: Ergal 7075
![Central-body](https://www.monnalisa-project.eu/wp-content/uploads/2021/10/Central-body.jpeg)
Central body (still under construction), the dowels along the profile are used only for mounting in the machine.
Material: Ergal 7075
![Wing attachment](https://www.monnalisa-project.eu/wp-content/uploads/2021/10/Wing-attachment.jpg)
Wing attachment / engine support.
Material: Steel 2311
![Mold](https://www.monnalisa-project.eu/wp-content/uploads/2021/10/Mold.jpeg)
Mold to laminate the carbon flap
![Landing-edge-part2](https://www.monnalisa-project.eu/wp-content/uploads/2021/10/Landing-edge-part2.jpeg)
Leading edge, part two.
Material: Ergal 7075
![Engine](https://www.monnalisa-project.eu/wp-content/uploads/2021/10/Engine.jpg)
Engine / scales support block for configuration 0°
Material: Ergal 7075
![Hinges](https://www.monnalisa-project.eu/wp-content/uploads/2021/10/Hinges.jpeg)
Hinges to be embedded in the carbon flap.
Material: Steel 2311